The chargers will be open to every car manufacturer and will use the universal CCS2 charging infrastructure.

  • BastingChemina@slrpnk.net
    link
    fedilink
    English
    arrow-up
    1
    ·
    4 days ago

    the devices can be powered by on-site battery packs topped up by solar panels.

    I believe this is the case for a lot of the very fast chargers, it’s easier to install batteries pack to smooth the consumption rather than upgrading the grid to handle the occasional peak consumption.